24-hour service hotline:4000 011 480
Tel:0750-3613461    
Fax:0750-3613461-5
Email:jddp666@163.com  
Alibaba:https://jdtl66.1688.com/
Web:http://www.jddipi.com/
Address:18th Floor, Lile Wudong Village, Jianghai District, Jiangmen City, Guangdong Province, China (Edited by A01 Factory)

Office Address: No. 159, Lexiang East Road, Wudong Village, Lile Town, Jiangmen City

CopyRight © 2019

Guangdong Jiangmen Jie Da Coating Material Ltd. 

粤ICP备11005041   Powered by www.300.cn  

 

Case

The 20,000 square meters stadium floor of Guangde Experimental School was completed and passed the acceptance test.

浏览量:

Guangde County Experimental Middle School is a private high school founded in June 2006 by Guangde Middle School of Anhui Province. The school is located in the new administrative district of Guangde County. The transportation is convenient and the environment is beautiful. It covers an area of ​​267 mu. It is designed according to the provincial model high school standard. The planned building area is 70,000 square meters. The facilities are complete, the quality is first-class and the characteristics are distinct.

 

Construction process:

 

· Ground treatment : Grinding, repairing, decontaminating and dusting according to the ground conditions

· Polyurethane primer: Uniformly roll polyurethane primer on the base layer

· Polyurethane coating: the polyurethane coating is fully coated

· Polyurethane topcoat layer: uniformly roll the ground surface with polyurethane topcoat

· Dashing: Standard marking with polyurethane marking paint

· The floor is put into use: it can be put into use after 7 days.

 

Floor maintenance:

 

1. After the construction of the flat land is completed, it needs to be maintained for 7-10 days before it can be put into use. During the curing period, water or other solution should be avoided to infiltrate the surface.

 

2. Any employee who enters the workshop must be replaced with a rubber-soled shoe (no black-soled shoes that can be worn at the bottom of the foam) (so that the outside sand will be brought into the workshop and the ground will be scratched)

 

3. Any hardware: such as iron chairs, iron tables, iron shelves, etc., should be wrapped with soft plastic, rubber or paper pad to avoid scratching the ground during use.

 

4, the tractor needs to fully lift the board off the ground, please pay special attention to the corner of the board when cornering, do not scratch the ground

 

5. When cleaning the floor, please use soft mop or wet and dry vacuum cleaner, clean with water or detergent, but please pay attention to the ground slippery

 

6. If it is worn or scratched due to long use time, local repair can be carried out in a small area. If the area is large, it is recommended to re-roll once.

 

7. Before the equipment enters the factory, lay the bottom of the cardboard box on the floor to avoid scratching the ground during the transportation equipment.

 

8, carts, cart wheels, please use hard or elastic rubber wheel, and separate use inside and outside the plant

 

9, can be waxed according to the ground requirements (the effect can prevent ground scratches)

 

广德实验学校2万平方米球场地坪完工并通过验收

 

Jiangmen Jieda Coating Co., Ltd. is a large-scale high-tech, professional industrial building materials company integrating scientific research, development, production, sales, engineering design and construction. The company has advanced production equipment and strong technical development capabilities. Mainly engaged in epoxy floor paint, waterborne epoxy floor paint, emery wear-resistant floor materials, concrete seal curing agent, pu plastic track, acrylic stadium, pvc plastic floor and other dozens of building materials.

 

 

 

 
 
Guangde County Experimental Middle School is a private high school founded in June 2006 by Guangde Middle School of Anhui Province. The school is located in the new administrative district of Guangde County. The transportation is convenient and the environment is beautiful. It covers an area of ​​267 mu. It is designed according to the provincial model high school standard. The planned building area is 70,000 square meters. The facilities are complete, the quality is first-class and the characteristics are distinct.