Epoxy construction points

浏览量:

Su deal

 

 ① basic elements in glossy or terrazzo cement powder to prevail;

 ② health factors to be more than 28 days, water must be below 8% if the construction elements to be removed to be uneven or hollowing;

 ③ with epoxy mortar fill level ground;

 ④ factors to be thoroughly cleaned of oil;

 ⑤ Construction pre-construction element to the need to keep dry and clean;

 

 Undercoat

 ① before construction adhesive to be kept clean if debris removal in the correct ratio will be the main agents and curing agent mixture, stir;

 ② subject to appropriate adjustment of viscosity of mixed conditions on the ground to complete the construction materials should be completed within 4 hours;

 ③ undercoat hardening regimen for about 8 hours or more.

 

 The coating

 ① If the pre-construction debris need to keep clean and clear adhesive to be the main agent in the correct ratio of hardener mixture, stir;

 ② the proper amount of resin mixture to complete quartz sand;

 ③ using trowel the material evenly coated;

 ④ mixed materials should be completed within 30 minutes of completion of construction;

 ⑤ the transfer of processing to do the construction junction;

 ⑥ health hardening the coating for about 8 hours or more.

 

 Approved soil

 ① the main agents in the correct ratio of hardener mixture, stir;

 ② Use the knife to batch uniformity of coating material;

 ③ mixed within 30 minutes to complete the construction materials required to complete;

 ④ approved hardening of soil health for about 8 hours or more;

 ⑤, as required, the number of road construction required to achieve smooth and no holes, no batch of knives and sanding India India prevail.

 

 ★ surface coating

 ① before construction debris to be kept clean if the adhesion to be removed;

 ② main agent first before using stir;

 ③ the main agents in the correct ratio of hardener mixture, stir;

 ④ Use roller or trowel to evenly coating material mixed to complete the construction materials should be completed within 30 minutes;

 Construction of the transfer should be done ⑤ junction processing;

 ⑥ construction is complete, 24 hours before the Master, 72 hours before the weight